Project Description
Our company has undertaken and performed the following engineering installations 100%
- Air-conditioning pipe installation of 3000 m. in total
- Fire fighting pipe installation of 1000 m. in total
- Water – sewage pipe installation of 4500 m. in total
Project details
Location
Kavala
Total Area of the Project
10.000 m2