Project Description
Our company has undertaken and performed the following engineering installations 100%
- Air-conditioning pipe installation of 14000 m. in total
- Fire fighting pipe installation of 12000 m. in total
- Water – sewage pipe installation of 30000 m. in total
- Steam pipe installation of 32000 m. in total
Project details
Location
Thessaloniki
Total Area of the Project
40.000 m2